GridBooster
More charging power when you need it
Is your grid connection too small to handle the charging peaks of your e-trucks?
GridBooster stores energy when capacity is available and delivers extra power when your operation needs it.
- Always charging ahead (fast)
- Reliable and certainty
- Modular and scalable


Get more from your existing grid connection
Not every truck charges at the same time. And your grid connection is not fully used every hour of the day.
GridBooster makes use of that available capacity. Energy is stored when there is room on the connection and used when several trucks need to charge at the same time or require additional power.
The result: more charging capacity without having to wait immediately for a larger grid connection.
Battery storage, charging and energy as one system
GridBooster does not operate separately from the rest of your charging site.
Through SonicCore, we coordinate battery storage, charging points, the grid connection and, where relevant, solar energy.
This ensures the available energy goes where it is needed most at that moment.

GridBooster
Modular by design
Start with the storage capacity you need today and expand later as your electric fleet grows.
LFP Battery system
Modular and expandable
Multiple containers can be combined
Designed to integrate with ChargeBooster and SonicCore
What does your operation need?


Sustainability in action
Second-life batteries
Some batteries are still perfectly suitable for stationary energy storage after their first use.
That is why we look at where second-life batteries make sense technically and financially within a charging and energy system.