Opening up your charging hub? What does it cost when your neighbour comes to charge?

“There’s 400 kW available. Why is the truck only charging at 150 kW?”

We received this question at Hedgehog Applications about the charging hub at one of our customers. A neighbouring business wanted to charge its e-truck there and expected more power. That makes sense. As a driver, you want to know how quickly you can get back on the road. But as the owner of the charging hub, you have another question: what will this charging session earn me?

Our team took a closer look. There was still headroom within the contracted grid capacity. So why was the truck still limited to 150 kW? We had agreed with the customer that SonicCore would ensure the peak demand at the grid connection stayed below a set limit. And for good reason.
The charging session would normally generate around €100 in revenue. But charging the truck at the maximum available power would, according to our calculations, have added roughly €800 to the operator’s grid charges. By limiting the charging power, SonicCore prevented those additional costs.

So watch out for this hidden cost!

Hedgehog Applications lader

How can a single truck increase your total monthly bill?
When someone else charges at your site, you will usually charge them per kWh: the amount of electricity supplied. But your own grid bill may also include costs based on kW. This is the amount of power your entire business draws from the grid at the same time. So how does that work?

Suppose you have 400 kW of contracted grid capacity. This is the maximum power you are allowed to draw under your contract. In this example, you also pay for your monthly peak, shown as kWmax on your bill. To determine this, the grid operator looks at the 15-minute interval in which your entire business drew the highest average amount of power from the grid. One busy 15-minute interval can therefore determine your costs for the entire month, even if you remain within your contracted capacity.

What does one peak cost, and what can you save by spreading the charging sessions?

At our customer’s site, the truck was charging at 150 kW. But for the grid bill, what matters is the amount of power the entire business draws from the grid during that same 15-minute interval. The examples below show what this can mean in euros.

In the first example, one additional truck comes to charge. In the second, the operator spreads the charging of their own trucks throughout the day.
Our calculation uses Enexis’ 2026 medium-voltage tariff for the MS-D category. Under this tariff, the monthly peak costs €3.66 per kW, excluding VAT. The tariff on your own grid bill may differ.

Maandpiek scenarios Hedgehog Applications

One detail makes a major difference. Had you already reached a peak of 400 kW earlier that month? If so, a second 15-minute interval at 400 kW would not result in additional peak charges. The €915 in the first example applies if your monthly peak would otherwise have remained at 150 kW without that single charging session.

By spreading the charging sessions, you can therefore lower your monthly peak while keeping the contracted 400 kW available for the days when you really need it.

So, how much charging power can you offer someone else?

Do you want to open your charging hub to the public? Start by comparing your own operational schedule with the 15-minute interval data from your grid connection. Pay particular attention to the time at which someone else wants to charge. Are your own trucks still on the road, or are they already plugged in? And if a subcontractor wants to charge at the end of the working day, how much power do you need yourself to get your machines ready for the next morning?

At our customer’s site, the neighbouring business could charge at 150 kW at that particular time. Once you know what your own trucks or machines need, you can agree on the available charging power in advance. The other party then knows how quickly they can charge at your site, while you know exactly what that charging session will earn you.

Charge and go! An e-truck or electric aircraft needs to keep moving

Hedgehog Applications - koning Willem Alexander

Heard in the transport market #1

Erik - Hedgehog Applications

TopMovers Oss is now offering smart charging

Hedgehog Applications - TopMovers Oss